In the late 90s, there were nearly 300 PIM
factories running around the world. However, the real problem is slowly
emerging, how to solve the following 4 issues became the key to PIM!
1 defect control: how can we eliminate weld
marks, cracks, voids, and other defects?
2 improve process yield: when you form a
yield of only 80%, it is difficult to be profitable.
3 dimensional control: as far as possible
to achieve the same size, the same shape of the product.
4 carbon control: bonding agent is very
easy to pollute the product, so it is difficult to achieve the specific
requirements of the carbon content of heat treatment steel; therefore, even
today, low carbon stainless steel is very difficult to do it out of PIM.