MIM(metal injection molding)technology is more
and more widely used in the manufacture of the metal parts, do you know the
process of MIM product development? ZCMIM tell you, there are Seven production
process of the product development, Customer needs assessment; Mold development
plan; Mold processing; Mold test; Sample make; Trial production; Mass
production, let's follow ZCMIM to know the specific work content of each
process
1.Customer needs
assessment
• Study of the drawings
• Study of the product requirements
• Other requirements and information
2. Mold development
plan
• Time for a day
• Mould design
• Product defect analysis
• Risk analysis
• Mould schedule
• Customer confirmation
3. Mold processing
and manufacturing
• Time for 15 days
• Mould manufacturing agreement with
outsourcing mould manufacturers
• Follow up tooling in progress, and quality
4. Mold test
• Test time for 3 days
• Check the pattern
• computer test
• check injection molded parts, density,
weight, appearance.
5. Sample test
• Injection molding,
• Check the appearance, density, weight.
• skim
• check the degreasing rate
• sintering
• pure plastic
• QC inspection and deliver (sign) sample.
6. Trial production,
• Try products order production
• Trial production, according to the sample
production process
• Trial-produce review
• Pilot run smoothly,
7. Mass production,
• Turn production evaluation
• Turn production
没有评论:
发表评论